Now you can Instantly Chat with ATLA!
About Me
Worked as SAP PM (Plant maintenance) Consultant having 2 years and 9 months in SAP PM Module. Have done one complete R/3 end to end implementation and one support project. Having good exposure in integration between SAP PM and other module. Solving t... one support project. Having good exposure in integration between SAP PM and other module. Solving tickets in timely manner and involved in integration testing. Good hand in configuration of Master Data, notifications and order process. Understanding the Business Requirement and prepare Business Requirement Document and Technical Specifications documents based on it. Responsible for configuration, testing and production support of SAP Plant Maintenance. Maintenance Processing such as Operational functions, Notification, Order and Planning, Scheduling and Completion.
Show MoreSkills
Portfolio Projects
Description
Giving support to the domestic Clients Understanding the Business Requirement and interacting with the clients directly to solve the tickets as Per SLA. Solving tickets in timely manner and updating in solution manager. Strong debugging, deep functional skills could work on individual assignment.
Show More Show LessDescription
• Project Description: Giving support to the domestic Clients
• Understanding the Business Requirement and interacting with the clients directly to solve the tickets as Per SLA.
• Solving tickets in timely manner and updating in solution manager.
• Project Contribution: Strong debugging, deep functional skills could work on individual assignment.
Show More Show LessDescription
Creation of Master data manually OR mass upload via LSMW i.e. Equipment master, Equipment task list, Functional location, BOM, Characteristic, classes, Permits, Catalogs. PM order Creation, Order Release, confirmations, posting orders, goods issue/receipts. Completing PM order Technically (TECO), order settlement, closing PM orders. Business process integration with PP, MM, CO and QM module. Configuring PM Master Data Records Planning plant, Functional location, Equipment, Bill of Materials, Work Centers, Order types. Configuration of maintenance plans (Single cycle, Strategy, and Multiple counter plan), Notification process. Configuration Preventive maintenance, Refurbishment process for repairable spares and external services, Calibration Business process. Preparation of task lists, maintenance plans, bill of materials and supporting master data. Processing Break down maintenance, Corrective maintenance, Preventive maintenance processes. Test Equipment calibration process. Single cycle plans, Time based, performance based strategy plans, Maintenance strategy, and Maintenance packages. Created Maintenance Plans & Scheduled the Plans as per requirements. Evaluated Mean Time to Repair and Mean Time between Failure reports for Equipments.
Show More Show LessDescription
. Creation of Master data manually OR mass upload via LSMW – i.e. Equipment master,Equipment task list, Functional location, BOM, Characteristic, classes, Permits, Catalogs.
· PM order Creation, Order Release, confirmations, posting orders, goods issue/receipts.
· Completing PM order Technically (TECO), order settlement, closing PM orders.
· Business process integration with PP, MM, CO and QM module.
· Configuring PM Master Data Records –Planning plant, Functional location, Equipment, Bill of Materials, Work Centers, Order types.
· Configuration of maintenance plans (Single cycle, Strategy, and Multiple counter plan), Notification process.
· Configuration Preventive maintenance, Refurbishment process for repairable spares and external services, Calibration Business process.
· Preparation of task lists, maintenance plans, bill of materials and supporting master data.
· Processing Break down maintenance, Corrective maintenance, Preventive maintenance processes.
· Test Equipment calibration process.
· Single cycle plans, Time based, performance based strategy plans, Maintenance strategy, and Maintenance packages.
· Created Maintenance Plans & Scheduled the Plans as per requirements.
. Evaluated Mean Time to Repair and Mean Time between Failure reports for Equipment’s.
Show More Show Less6394.28 USD / Year (Expecting)
-
Start Date / Notice Period end date: 2019-11-08